Time and Work

What this topic is about

People (or machines, or pipes) do a job at different speeds. Questions ask how long the job takes when they work alone, together, or one after another.

The "units" method (use this for every question)

Instead of using fractions like 1/10 and 1/15, pretend the job is made of small units (like bricks in a wall).
  1. Total work = a number that all the given days divide into (the LCM).
  1. Each person's speed = total work ÷ their days (units per day).
  1. Working together = add their speeds. Then time = total work ÷ combined speed.
💡
Why this is easier: if A takes 10 days and B takes 15 days, call the job 30 bricks. A lays 3 bricks a day, B lays 2. Together 5 a day, so 30 bricks take 6 days. No fractions at all.

Question types at a glance

#
Type
What is asked
Key idea
1
Working together
A and B together
Add the units per day
2
Find one person's time
Together and one alone are given
Subtract the units per day
3
Someone leaves midway
Work together, then one finishes
Work done so far, then the rest
4
Men-days
More men, fewer days
Men × Days stays the same
5
Pipes and cisterns
Filling and leaking pipes
A leak is a negative worker
6
Efficiency
"A is twice as good as B"
Speeds in that ratio

Type 1: Working together

Idea: find the total units, each person's daily units, and add.
✏️
Solved example: A can finish a job in 10 days and B can finish it in 15 days. How long will they take together?
  1. Total work = LCM of 10 and 15 = 30 units.
  1. A does 30 ÷ 10 = 3 units a day. B does 30 ÷ 15 = 2 units a day.
  1. Together = 3 + 2 = 5 units a day.
  1. Time = 30 ÷ 5 = 6 days.
▶ Try it yourself: change A's and B's days and press Play. Switch to "works against" for pipe and leak questions (Type 5).
Practice: A can do a job in 12 days and B in 24 days. How long will they take together?
Answer: Total = 24 units. A = 2 units/day, B = 1 unit/day. Together = 3 units/day. Time = 24 ÷ 3 = 8 days.

Type 2: Find one person's time

Idea: together speed − known person's speed = other person's speed.
✏️
Solved example: A and B together finish a job in 12 days. A alone takes 20 days. How long will B take alone?
  1. Total work = LCM of 12 and 20 = 60 units.
  1. A + B together = 60 ÷ 12 = 5 units a day. A alone = 60 ÷ 20 = 3 units a day.
  1. So B = 5 − 3 = 2 units a day.
  1. B alone = 60 ÷ 2 = 30 days.
Practice: A and B together take 6 days. A alone takes 10 days. How long does B take alone?
Answer: Total = 30 units. Together = 5/day, A = 3/day, so B = 2/day. B alone = 30 ÷ 2 = 15 days.

Type 3: Someone leaves midway

Idea: first find how much work is done while both are working. The rest is done by whoever stays.
✏️
Solved example: A can do a job in 20 days and B in 30 days. They work together for 6 days, then A leaves. How many more days will B take to finish?
  1. Total work = LCM of 20 and 30 = 60 units. A = 3/day, B = 2/day.
  1. In 6 days together: 6 × (3 + 2) = 30 units done.
  1. Work left = 60 − 30 = 30 units.
  1. B alone does 2/day, so B needs 30 ÷ 2 = 15 more days.
Practice: A can do a job in 10 days and B in 15 days. They work together for 3 days, then B leaves. How many more days will A take?
Answer: Total = 30 units. A = 3/day, B = 2/day. In 3 days: 3 × 5 = 15 units. Left = 15 units. A alone: 15 ÷ 3 = 5 more days.

Type 4: Men-days (more workers, fewer days)

Idea: the total work is the same, so men × days stays the same. If hours per day also change, use men × days × hours.
✏️
Solved example: 12 men can build a wall in 20 days. How many days will 15 men take?
  1. Total work = 12 × 20 = 240 "man-days" (one man would need 240 days).
  1. With 15 men: 240 ÷ 15 = 16 days.
In plain words: more people share the same work, so it finishes sooner.
Practice: 8 men can finish a job in 18 days. How many days will 24 men take?
Answer: Total = 8 × 18 = 144 man-days. With 24 men: 144 ÷ 24 = 6 days.

Type 5: Pipes and cisterns

Idea: a pipe that fills is a worker. A pipe that empties (or a leak) is a worker doing negative work, so subtract it.
✏️
Solved example: Pipe A can fill a tank in 10 hours. Pipe B can empty the full tank in 15 hours. If both are opened together, how long will the tank take to fill?
  1. Tank = LCM of 10 and 15 = 30 units.
  1. A fills 3 units/hour. B empties 2 units/hour.
  1. Net filling = 3 − 2 = 1 unit/hour.
  1. Time = 30 ÷ 1 = 30 hours.
(Use the animation in Type 1 with "works against" selected to watch this.)
Practice: Pipes A and B fill a tank in 6 hours and 12 hours. Pipe C empties it in 8 hours. If all three are opened, how long will the tank take to fill?
Answer: Tank = LCM(6, 12, 8) = 24 units. A = +4, B = +2, C = −3 per hour. Net = 4 + 2 − 3 = 3 units/hour. Time = 24 ÷ 3 = 8 hours.

Type 6: Efficiency ("A is twice as good as B")

Idea: efficiency is speed. If A is twice as efficient, A does 2 units for every 1 unit B does.
✏️
Solved example: A is twice as efficient as B. Together they finish a job in 12 days. How long would each take alone?
  1. Let A do 2 units/day and B do 1 unit/day. Together = 3 units/day.
  1. Total work = 3 × 12 = 36 units.
  1. A alone = 36 ÷ 2 = 18 days. B alone = 36 ÷ 1 = 36 days.
Practice: A is 3 times as efficient as B and finishes a job 20 days earlier than B. How long will they take working together?
Answer: If A takes x days, B takes 3x days. The gap is 3x − x = 2x = 20, so x = 10. A = 10 days, B = 30 days. Total = 30 units: A = 3/day, B = 1/day, together 4/day. Together = 30 ÷ 4 = 7.5 days.

Common mistakes

  • Adding the days (10 + 15 = 25) instead of adding the daily work.
  • Forgetting that a leak or emptying pipe must be subtracted.
  • In "leaves midway" questions, giving the answer as the remaining days only when the question asks for the total days (or the reverse). Read the question carefully.
  • Mixing up efficiency and time: twice as efficient means half the time.